Our process
How a Bathroom Remodel Works
A bathroom remodel with us follows six clear steps, from the first phone call to the final walkthrough. First we talk through what you want to change and ask about your home, your building and your timing. Then we look at the bathroom, take measurements and check for problems that are common in older Boca Raton homes, like cast iron drains, soft subfloor or moisture behind tile. Next you get a written scope that spells out the layout, materials, permits, allowances and schedule, so you know exactly what is included. If you live in a condo or a community with an HOA, we prepare what the association needs for approval. Permits are pulled with the City of Boca Raton or Palm Beach County when the work requires them. During construction we protect your home, keep the site clean and follow inspections at each required stage. At the end, we walk through the finished bathroom with you and make sure everything works. This page explains each step in more detail and how long the whole process usually takes.
- Six clear steps
- Written scope before work starts
- Inspections at each required stage

The six steps
- First conversation. You tell us what bothers you about the bathroom and what you want instead. We ask who uses it, whether you are in a condo or HOA, and when you want it done.
- Look and measure. We see the room, measure it and look for signs of old plumbing, leaks or uneven floors. In condos, we also ask for the building’s alteration rules.
- Written scope. You get a plain-English scope with the layout, fixture and finish choices, allowances for hidden problems, the permits needed and the expected schedule.
- Approvals and permits. We prepare the condo or HOA package if needed, then file permits with the city or county.
- Construction. Protection goes down, the old bathroom comes out, and plumbing, electrical, waterproofing, tile, fixtures and glass go in. Inspections happen at the stages required.
- Final walkthrough. We test everything with you, fix anything on the punch list and close out the permit.
How long does it take?
| Stage | Typical time |
|---|---|
| Planning, selections and ordering | A few weeks |
| Condo or HOA approval (if needed) | About 2 to 6 weeks |
| Permit review | Often around 3 weeks in Boca Raton |
| Construction | About 1 to 3 weeks for a shower or guest bath, longer for a full primary suite |
The fastest way to keep things moving is to make your choices early and send any association paperwork in one complete package.


What we need from you
- A sense of your budget range
- Your condo or HOA alteration rules, if you have them
- Any photos or ideas you like
- Who uses the bathroom and any safety needs
- Your preferred timing, including when you will be in town
Not sure where to start? Our cost guide and permits and HOA guide answer the most common questions.
Ready for step one?
Request a call back and tell us about your bathroom. That first conversation is where every good remodel starts.