Permits & approvals · Boca Raton
Bathroom Remodel Permits & HOA Approval in Boca Raton
Most bathroom remodels in Boca Raton need at least one permit, and many also need approval from a condo association or HOA before work can start. The rule of thumb is simple: if the work touches plumbing, electrical or structure, it needs a permit. That includes moving or replacing a shower valve or drain, adding wiring for lights, outlets or a fan, and taking out or moving a wall. Painting, new mirrors and swapping accessories usually do not. Homes inside city limits get permits from the City of Boca Raton, while unincorporated West Boca, including areas like Boca Del Mar, Hamptons at Boca and many country club communities, goes through Palm Beach County. Projects over $5,000 also need a recorded Notice of Commencement. Condo associations usually want a full approval package first, which takes about two to six weeks, and some buildings are busy with milestone inspection repairs through 2026. This guide explains what needs a permit, who issues it, the usual order of steps and how to avoid delays.
- City and county permits explained
- Condo and HOA approval steps
- Common delays and how to avoid them

The basics
What usually needs a permit in a bathroom remodel
| Work | Permit usually needed? |
|---|---|
| Moving or replacing a shower valve or drain | Yes, plumbing |
| Moving a toilet or sink | Yes, plumbing |
| New lights, outlets, heated floor or exhaust fan wiring | Yes, electrical |
| Removing or moving a wall | Yes, building and possibly structural |
| Replacing a bathroom window | Yes, and it must meet Florida wind rules |
| Swapping a vanity in the same spot, no plumbing changes | Often not |
| Paint, mirrors, towel bars, accessories | No |
Not sure whether you are inside city limits? Many addresses with a Boca Raton mailing address are actually in unincorporated Palm Beach County. Your property record on the Palm Beach County Property Appraiser site shows which one you are in.
Order of steps
The usual order for a permitted bathroom remodel
- Association or HOA approval if you live in a condo or a community that requires it.
- Permit application with the scope, and drawings if the layout changes.
- Notice of Commencement recorded with the county for projects over $5,000.
- Rough inspections of plumbing and electrical while the walls are open.
- Finish work such as waterproofing, tile, fixtures and glass.
- Final inspection to close the permit.


Associations
Condo and HOA approval in Boca Raton
Condos. Most condo associations need written approval before any bathroom work. Expect to submit the application, a scope of work, the contractor’s license and insurance certificate naming the association, product sheets and the underlayment specification for tile floors. Our condo bathroom page goes step by step.
Gated HOA communities. In many single-family communities, interior work does not need design review, but the HOA still controls access. Contractors often have to register, carry certain insurance, get gate passes and work set hours.
Milestone inspections. Florida requires milestone structural inspections for condo buildings three stories and taller. With deadlines tied to December 31, 2026 for many South Florida buildings, some associations are limiting owner projects during major repairs, so ask before you book.
Avoid delays
How to keep approvals and permits moving
- Get your association’s alteration rules before you design, not after
- Send a complete approval package in one go
- Choose tile and underlayment that already meet the building’s sound rules
- Make layout decisions early, since moved plumbing needs more review
- Schedule around the winter season if your building limits noisy work then
- Always confirm the contractor doing the work holds an active Florida license at myfloridalicense.com
Want to understand the cost side too? Read our Boca Raton bathroom remodel cost guide.
Bathroom permit and HOA questions
Do I need a permit to remodel a bathroom in Boca Raton?
You usually need a permit when the work touches plumbing, electrical or structure: moving or replacing a drain or shower valve, adding outlets, lights or a fan with new wiring, or removing a wall. Purely cosmetic work like painting or swapping a mirror usually does not. Inside city limits the City of Boca Raton issues permits; in unincorporated West Boca it is Palm Beach County.
How long does a bathroom permit take in Boca Raton?
Simple plumbing and electrical permits can move quickly, while plan review for layout or structural changes takes longer. Permit tracking data puts typical Boca Raton review at around three weeks. Condo or HOA approval usually has to come first and can add two to six weeks.
What is a Notice of Commencement?
It is a form recorded with the county before work starts on most Florida improvement projects over $5,000. It protects you from liens by showing who the owner, contractor and lender are. Your permit usually is not activated for inspections until it is recorded.
Can I pull my own permit as a homeowner?
Florida allows owner-builder permits, but you must do the work yourself or directly supervise it, and you take on the legal duties a contractor would normally carry. For plumbing and electrical work in a bathroom, most owners are better off having a licensed contractor pull the permit.
What happens if a bathroom was remodeled without a permit?
It can come up when you sell, refinance or file an insurance claim. The city may require the work to be permitted after the fact, which can mean opening walls for inspection. It is almost always cheaper and safer to permit the work at the start.
Does my HOA need to approve an interior bathroom remodel?
In a condo, almost always. In a single-family HOA community, interior work often does not need design approval, but many gated Boca communities still require contractor registration, gate passes, proof of insurance and set work hours.
Not sure what your project needs?
Tell us where you live and what you want to change. We will explain which permits and approvals are likely involved.
